Interactive AGV Lifting Column Demo

Click a scenario or move the sliders to compare stroke, moving load and stability margin.

High shelf
Work table
Conveyor
Low station
Stroke 350 mm
1.7xLoad margin target
MediumMoment risk
ModerateSpeed advice

Transfer AGV Recommendation

Use a compact lifting column with stable repeat positioning. Match speed to conveyor takt time and reserve enough closed height inside the AGV body.

  • Verify total moving mass, including tooling and brackets.
  • Check center of gravity when the top module is extended.
  • Confirm voltage, controller signals and emergency stop logic early.